NC Licensed & Insured · Eaton CertifiedMon–Fri 9:00a–4:30p
Serving Asheville & Buncombe County
Volt Electric USA · Asheville, NC

Electrical panel upgrades and breaker repair in Asheville

If breakers trip when two things run at once, the panel is warm or buzzing, or you are adding an EV charger, heat pump or addition, your panel is usually the first thing to look at. We replace obsolete panels, upgrade service to 200 amps, add sub-panels and pull new circuits.

100 to 200 amp service upgrades

We replace the panel, coordinate the disconnect and reconnect with Duke Energy, pull the permit and get the inspection. Older homes around Asheville often still have 100-amp service that cannot carry a modern kitchen, heat pump and EV charger together.

Sub-panels for shops, garages and additions

A sub-panel brings capacity where you need it without running every circuit back to the main panel. We size the feeder correctly so the shop saw and the space heater can run at the same time.

Breakers and new circuits

Worn breakers that trip for no reason, or a dedicated 20-amp circuit for a freezer, microwave or office: these are quick jobs and we price them before we come.

Signs your panel needs attention

Frequent tripping, flickering when appliances start, scorch marks, a burning smell, double-tapped breakers, or a brand that has a history of failures. If you notice heat or burning, turn off the main and call us during office hours, or call 911 for smoke or fire.

Price book

What it costs

Single breaker replacement$150–$300
New 20A circuit$250–$600
Sub-panel install$1,000–$2,000
Panel upgrade 100→200A$2,000–$4,000

Ranges from our published price book. Your exact number is confirmed on site before any work starts.

Questions we get

How much does a panel upgrade cost in Asheville?

A 100-to-200-amp upgrade is shown in the price ranges on this page. The final number depends on the meter base, grounding and how much needs to move; the free on-site assessment confirms it before any work starts.

How long does a panel upgrade take?

Most residential panel changes are done in a day, with power off for part of it. The utility disconnect and reconnect, the permit and the inspection are scheduled by us.

Do you handle the permit and inspection?

Yes. We pull the permit on every job that needs one and schedule the county inspection.

Service area

We do panel upgrades & breakers across Buncombe County. See all service areas.

AshevilleCandlerArdenFairviewWeavervilleBlack MountainLeicesterSwannanoaBiltmore Forest
Other services
Want the number before we knock?
Describe the job and get a real range in seconds.